Bubny Redevelopment/ORCO Property Group
Creating solutions to deliver greater
profit in a challenging market
The Bubny site located in the Holesovice district of Prague, is
one of the few remaining major regeneration sites available in the
city. It represents the biggest regeneration project by floor area
in all of Central Europe. ORCO acquired the site in 2007 and have
set out to establish a clear vision for the regeneration of the
site over a long term 15-20 year delivery timescale.
The challenges included the complexities of
the site andthe financial burden of railway, subway and highway
infrastructure improvements, which represent major barriers to
financial success. For these reasons, the Bubny project requires an
alternative and innovative approach to funding and delivery. Due to
the strategically important nature of the site, in the context of
Prague’s urban design framework, the long term programme needs to
be interlinked with municipal investment programmes, for the
delivery of proposed infrastructure improvements adjacent to the
site.Considering the following variables:
- the need to deliver a long term scheme of varied content and in
line with market demand
- external constraints, and
- financial viability requirements,
the Bubny project requires a considerable
amount of flexibility and most importantly, the challenge facing EC
Harris is delivering to a project that must maximise certainty over
normally high risk infrastructure costs.
Creating solutions
- EC Harris has established a master cost plan for this
development, linking asset creation on a building by building, plot
by plot, phase by phase basis. This plan enables the client and
design team to assess the impact of changing functional use, area,
efficiency parameters and infrastructure provision, on the
financial appraisal for the development.
- By using external benchmark data for building shapes and
efficiencies, EC Harris has been able to drive the necessary client
brief parameters for each type of building. This now determines the
‘baseline’ for the progression of the master plan into delivery
phase which has now commenced.
Adding value
EC Harris added value through the delivery
process by:
- The establishment of a complete commercial control platform
that has put the client in control of this major complex long term
investment, through access to client design brief, capital cost
targets, cash flow and phasing requirements.
- The ability to influence the design of the master plan from a
building morphology and specification perspective, maximising the
profit creation potential from the scheme.